All installations and maintenance conducted by Voltage Electrical Contracting are in accordance to Australian Standards. Some installations may have some irregularities either to the item being installed and the location and/or environment may not be known at the time of quoting. Our best endeavours, experiences and knowledge have been used to ensure an accurate and true presentation of the task at hand when it is presented. Should there be any variation to the arranged expectations of the job, Voltage Electrical Contracting will at all times when possible, contact the person or business responsible for the works and advise variation to the task at hand. This may incur a variation to labour and material. We take no responsibility and will not be liable in any way for work or alternations completed by other electrical contractors, businesses or personal work after our completed installation date.
We certify our quotations are a complete and accurate summary at the time of our inspection of the property and from the information provided to us by the client. Our quotations are valid for 30 days.
Faulty Equipment or Unsafe Wiring
Pursuant to the “AS/NZS 3000:2007 WIRING RULES” we are not permitted to allow unsafe wiring or equipment to be connected or remain connected to an electrical installation or supply of electricity. Therefore, if faulty or unsafe wiring or equipment is discovered, we are legally obliged to repair or isolate the circuit or faulty equipment. As a result of this requirement, we may be required to perform additional work at your property above and beyond what was quoted for. By accepting our quote, you also authorise us to perform such additional work as we see necessary to ensure compliance with the “AS/NZS 3000:2007 WIRING RULES”, and you agree to pay the cost of such works.
For The Installation Hard Wired Smoke Alarm
It is recommended that smoke detectors are installed on the ceiling and if this is not possible on a wall within 300mm of the ceiling. Hard wired smoke detectors require entry to the ceiling space for installation which is usually accessed through a man hole in the ceiling. Should the construction of the roof space be a skillion roof (flat roof) extra time may need to be taken to remove the tiles or roof sheeting to access the ceiling. In the case of two storey units or homes, the ceiling is concrete or wooden with no ceiling cavity. In this instance it would be necessary to install a smoke detector approx 500mm from a light fitting (to obtain a power feed for the alarm) and the installation of unavoidable surface mount ducting. Additional time in labour and materials would be added to the installation cost.
SMOKE ALARMS
The two most common types of smoke alarms used today are: Photoelectric alarms and ionisation alarms.
Ionisation smoke alarms detect large quantities of very small particles entering an ionisation chamber. An alarm condition occurs when the ion flow is affected by smoke particles. This type of alarm is most effective to detect small particles of smoke.
Photoelectric smoke alarm is based on the principle of optical detection. It is also known as the “scattered” light principle. An alarm condition occurs when smoke particles enter a light path and some of the light is “scattered” by reflection and refraction onto a sensor, this type of alarm is best for areas where dense smoke may occur, such as in ductwork. Photoelectric alarms can minimise the incidence of nuisance tripping.
9 Volt Lithium Battery Smoke Alarms with non removable battery may be used in a dwelling where there is no hidden space in which to run electrical wiring and no appropriate alternative location. As defined in “Building Amendment Regulation 2009”, Regulation 38.O, the owner of the dwelling is to contact their local government of the district for approval of this type of alarm.
Asbestos Surcharge
Voltage Electrical Contracting operates under relevant occupational health and safety legislation and the “National Code of Practice for the Safe Removal of Asbestos”. Voltage Electrical Contracting have a surcharge of $100.00 plus GST for the safe work practice when working on switchboard panels containing asbestos. This is to cover the cost of PPE and additional time to work on affected boards and will be added to the installation cost. Codes are “National Code of Practice for The Safe Removal of Asbestos 2nd Edition (NOHSC: 2002 (2005))”. Code of Practice for the Management and Control of Asbestos in the Workplace NOHS: 2008 (2005).
Hard digging/Site works
Types of soils are generally only known once work begins and can change from site to site. Previous construction works may have deposited foreign objects, building waste such as concrete and rubble which can be uncovered and cause delays with trench works. This may require extra time in labour to remove these obstructions when trenching or preparing a site. If hard rock is discovered and there is no alternative route for the work at hand, specialist equipment will be hired and labour charged additionally to the quoted works. At all times Voltage Electrical Contracting will inform the appropriate person advising any changes to the scheduled work.
Multi-storey Properties
Design and the necessity to work at heights may incur additional labour and the hire of scaffolding and/or elevated work equipment.
Roof Design
The design of the roof and the access area may require additional labour with the removal and replacement of tiles or sheeting.
Parking Access
Voltage Electrical Contracting will pass on to the client any fees for parking or any special permits as required to access service vehicles to the area. In the instance of free parking available at the work site we normally require a minimum of two regular car bays be made available for our vehicles and equipment.
Working Hours/Office Hours
Working hour time schedule is Monday to Friday between the hours of 7am and 4pm, unless otherwise arranged with Voltage Electrical Contracting. Office hours are Monday to Friday 7am to 4pm.
Rewires
Rewiring of dwellings to conform to current Australian Standards include building wiring only, it does not include re-conditioning of the internal wiring of lights, fixtures, appliances etc.
Warranties and Services
The Competition and Consumer Act 2010 (Cth) protects our customers with goods and services provided by Voltage Electrical Contracting. Voltage Electrical Contracting only use quality materials with manufacturer’s warranties/guarantees. Voltage Electrical Contracting workmanship is warranted for a 24 month period from the day the works are completed. Charges for labour are not covered by manufacturer’s warranties/guarantees of products and are required to be paid for by the originator of any works and/or agent acting on the behalf of the owner of the property. Labour cost to investigate faulty products is charged at our schedule fees. Material purchases and warranty claims are managed by Voltage Electrical Contracting on your behalf as this is the preferred system with suppliers. Should our customers not be satisfied with any aspect of our work please contact Voltage Electrical Contracting.
Terms of Payment are payment on job completion unless otherwise arranged. Methods of payment are EFT, Credit Card VISA or MASTERCARD or Bank Transfer